Protecting the health and safety of workers during the removal of lead paint from imported transformers for Tarong Power Station.

Dust Control at Olympic Dam for Mine Shutdown Works
Andy Greenslade2023-10-20T10:42:31+10:00The Olympic Dam Mine, owned by BHP, is a large poly-metallic underground mine located in Roxby Downs, South Australia. It is the fourth largest copper deposit and the largest known single deposit of uranium in the world.
Dust Control For Ship Loading
Andy Greenslade2023-10-10T07:23:58+10:00The correct dust control solution can increase conveyor speeds, reduce loading times, reduce port charges and labour costs while protecting the health and safety of workers and nearby communities
Dust Control during Urban Development
Andy Greenslade2023-10-11T12:00:51+10:00The rental of the JMS-20-MDT and JMS-30-MDT allowed our client to increase excavation speeds, saving valuable time and money while protecting the health and safety of workers and travellers on the adjacent highway.
Dust Control for Ship Unloading
Andy Greenslade2023-10-10T07:26:55+10:00Petcoke is transported into Gladstone by ship and unloaded from the shipping hull into storage containers using the "Grab" method.
Sydney Metro-Central Walk
Andy Greenslade2023-05-25T12:42:18+10:00Grydale’s in-house engineering team completed ventilation system design modeling for Laing O’Rourke to determine the ventilation and dust control requirements for the development of Central Walk...
Breedon Quarry Case Study
Andy Greenslade2022-12-08T13:43:26+10:00When rock excavation specialists AJ Gammond was approached to work at Breedon Quarry, Managing Director, Bruce Gammond was aware of the challenges that would be faced regarding dust control.
City Rail Link Project
Andy Greenslade2022-07-11T15:02:23+10:00City Rail Link (CRL) is Auckland’s first underground rail line and the largest transport infrastructure project ever undertaken in New Zealand...
Tunnelling Ventilation Design
Andy Greenslade2023-09-18T13:49:20+10:00Each tunnel project is unique and so is each ventilation design and dust control solution...
Melbourne Metro Tunnel Project
Andy Greenslade2022-12-08T14:29:25+10:00The Melbourne Metro Stations will be built as trinocular caverns, where three overlapping tunnels will be mined by roadheaders to create one of the widest metro platforms in the world...
Dust Control with T1055 Trencher
Andy Greenslade2022-07-11T15:04:48+10:00Green Civil rented a JMS-20-Mobile Diesel Track dust collector from Grydale to work alongside a Vermeer Trencher to manage the dust created from trenching work in Sydney...
Greenbank Sewer Rising Main Project
Andy Greenslade2023-09-18T13:47:45+10:00In this project the trencher removed the rock and the JMS-20-Mobile Diesel Track dust collector extracted dust and exhausted clean air back to the environment.